Our Project

Om Sai Hydro Investment Company

Project Details

Location

Kalinchowk Rural Municipality, Ward No. 1, Thami Gau, Nepal

Installed Capacity

3 MW

Total Project Cost

NPR 59.5 Cr

Construction Period

18 Months

Financial Highlights

Enhancing Nepal’s energy security by helping to utilize its renewable
hydro resources and reduce imports of electricity

Revenue Projection

NPR 10.6 Cr. Annually

KEY Technical Features

Energize Society With Sustainable
And Reliable Energy Systems!

Headworks

  • 10 m wide small headworks ( simple to construct)

Pipeline

  • Very small length of pipe alignment (1350 m) with diameter ranging from 0.8 m to 0.7 m.

Turbine

  • Forged Pelton turbine manufactured in Europe(CNC), ensuring high-quality
  • performance and durability

Transmission Line (TL)

  • 5 km TL length
  • Connection voltage: 33 kV