Tenx

OUR Project

Tenx Hydro Investment Company

Project Details

Location

Kalinchowk Rural Municipality, Ward No. 1, Thami Gau, Nepal

Installed Capacity

3 MW

Total Project Cost

NPR 59.5 Cr

Construction Period

18 months

About Company

Hydropower plays a predominant
role in Nepal's electricity
system.

The increase in extreme weather events and rising sea levels are unmistakable signs of climate change. Roughly 850 million people still live without access to electricity, which is the foundation of sustainable development.

Backed by reputable promoters with proven expertise in hydropower development.

Backed by reputable promoters with proven expertise in hydropower development.

Backed by reputable promoters with proven expertise in hydropower development.

Backed by reputable promoters with proven expertise in hydropower development.

why invest

Why Invest in Tenx Small Hydropower Project?

Strategic Location

Located in Kalinchowk, a region with significant hydropower potential..

Fast Project Timeline

 Construction period of only 18 months with all key documentation already completed.

Proven Technology

European-manufactured Pelton turbine ensuring high efficiency and longevity.

Stable Revenue

Projected annual revenue of NPR 10.6 Cr. with secure PPA terms.

Strong Promoter Base

Backed by a consortium of experienced and reliable promoters

Construction Perod
0 months

About Company

Hydropower plays a predominant
role in Nepal's electricity
system.

The increase in extreme weather events and rising sea levels are unmistakable signs of climate change. Roughly 850 million people still live without access to electricity, which is the foundation of sustainable development.

3 MW

Install Capacity

NPR 59.5 Cr

Total Project Cost

KEY Technical Features

Energize Society With Sustainable
And Reliable Energy Systems!

Headworks

  • 10 m wide small headworks ( simple to construct)

Pipeline

  • Very small length of pipe alignment (1350 m) with diameter ranging from 0.8 m to 0.7 m.

Turbine

  • Forged Pelton turbine manufactured in Europe(CNC), ensuring high-quality
  • performance and durability

Transmission Line (TL)

  • 5 km TL length
  • Connection voltage: 33 kV